Friday, July 17, 2015

House Coming Along

We've had some set backs lately with the house, but overall it is moving forward and we hope to move in sometime early August.

Bronson is doing a ton of work these days!  Not pictured below, but last night he installed the facet for the kitchen sink.  Once the floors get their final coat of polyurethane he will install the appliances. We've had to re-do some drywall and re-do some painting and that has been frustrating, but overall we are loving the results.  Mom's favorite room is the kitchen!


 The 3rd floor we had to completely re-do the drywall and re-paint, but it looks fabulous now ;-)
 Master bathroom tile, vanity and toilet that Bronson installed.
 Boy's bathroom vanity.  We went with Ikea vanities and facets for 3 of the bathrooms and really, really like the results.
 More of Bronson's handywork (tile and vanity)
Ikea is great for small-space solutions!  The office bathroom is very, very tiny, so a tiny, tiny vanity was the perfect fit!  Bronson did a great job with this tile too!!